Which authority approves your plan, what documents you need, and how long it takes.
Before construction begins, your building plan must be approved by the right local authority.
GHMC or HMDA?
Plots within Greater Hyderabad Municipal Corporation limits are approved by GHMC. Plots in the wider metropolitan region usually fall under HMDA or the local municipality.
Documents typically required
- Sale deed and link documents
- Encumbrance certificate
- Approved layout / LRS documents
- Architectural and structural drawings
- Property tax receipts
Timelines
Online applications are processed through TS-bPASS. Simple residential plans can be approved quickly; larger buildings take longer and may need additional NOCs.
Our team prepares the drawings and supports you through the process, so construction can start without surprises.