The inspections that matter at every stage — and the questions to ask your builder.
Quality is built in at every stage, not checked at the end.
Foundation
Check excavation depth, PCC levels and reinforcement spacing before concrete is poured.
Structure
- Cube tests for every major pour
- Cover blocks under reinforcement
- At least 7–14 days of curing for slabs
Masonry & plastering
Line, level and plumb checks; proper bonding and curing of plaster.
Services
Pressure-test plumbing lines and check electrical circuits before walls are closed.
Finishing
Tile hollowness, paint coverage, door and window alignment.